Particularly impressive is the site of the future passenger terminal building, an X-shaped structure of 743,000m2, where an enormous concrete floor plate has been prepared. The basic structure of the 90-meter tall control tower capable of resisting earthquakes up to 9.2 magnitude is complete a massive steel structure is being mounted on the huge concrete basement. Since the construction site is located in the basin of the former Lake Texcoco, the soil for the construction of the runways is being compacted by making it sink two meters into the ground and stabilizing the material below through compression. Specially designed concrete products to meet LEED standards A railway line is being built for the logistics of construction that will later serve the passengers. ![]() ![]() 4,000 trucks move in and out of the compound every day with building and recycled materials. At the Mexico City New International Airport – Nuevo Aeropuerto Internacional de la Ciudad de México (NAICM) – 50,000 workers are engaged on the site seven days a week – their number will triple as work progresses.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |